Published in: 2009
Publisher:
ROSA project, Arusha, Tanzania
Author:
Senzia, M.A., Lechner, M., Müllegger, E., Kimwaga, R.
Uploaded by:
SuSanA secretariat
Partner profile:
common upload
5470 Views
45 Downloads
Location of library entry
The estimation of transportation costs, which will allow operators to make profit, is affordable to majority of residents in study area and as such there is a high chance for O&M of UDDTs to succeed in Arusha municipality. The important issue here is for the Municipal authority to establish resource-oriented section within the sanitation department to coordinate the process?There has been increase in number of UDDTs by 60% from 5 UDDTs in 2008 to 8 UDDTs in 2009 as a results of availability of masons trained by the ROSA project and promotion activities.
Senzia, M.A., Lechner, M., Müllegger, E., Kimwaga, R. (2009). Local requirements and constraints of O&M of urine diverting dry toilets - Final report on O&M research topic. ROSA project, Arusha, Tanzania
English Operation, maintenance and sustainable services (WG10) Sub-Saharan Africa Urine diversion dehydration toilets (UDDTs)
Share this page on